UltraTech Cement
Website:
ultratechcement.com
Job details:
Job Purpose
To support PF & SH Accounts in optimizing and analyzing manufacturing cost by preparing costing reports, analyzing actual manufacturing costs with respect to budget, last month, last year and with other group companies. Prepare variance analysis report of manufacturing fixed overheads and variable overheads with respect to budgeted cost and finding area of improvement for the Unit. Preparation of other periodic financial reports to comply with the requirement of quarterly, half yearly and yearly closing of books and submission of various details to the Auditors.
Job Context & Major Challenges
Job Context: Andhra Pradesh Cement Works (APCW) : a unit of UltraTech Cement Limited, a flagship company of the Aditya Birla Group is situated at Tadipatri, District - Anantapur. APCW has 2 Lines. Line-1 was commissioned in 1998 with an installed capacity of 2 million tons (2 MTPA) cement annually, which has been enhanced to 2.7 MTPA over a period of six years through several improvements and modifications. Line-2 was commissioned in August 2008 with an installed capacity of 3.4 MTPA. The total cement production capacity of APCW, along with the associated Units, is 11 MTPA. The integrated plant is associated with two grinding units and one bulk terminal - Arakkonam Grinding Unit (ARCW) in Tamil Nadu, Ginigera Grinding Unit (GICW) in Karnataka and Shankarapalli Bulk Terminal (SBT) in Hyderabad. The unit has also established a thermal power plant of 4 X 25 MW capacity to cater the plant's power requirement.
The APCW Mine is located near Tummalapenta Village, Kolimigundla Mandal, Kurnool District at Andhra Pradesh. It has a production capacity of 9.20 MTPA. The mine lease extents up to 844.939 hector. It was opened in the year July 1997. The general geology falls in Narji Limestone formation of Kurnool system, age of 800 Mio years old. As per UNFC classification, mine has got the limestone reserves of 181.65 Mio MT as on 31 March 2012. It is one of the largest mines producing 9.20 Mio MTPA limestone at single location.
Major Challenges: -
- To improve Financial awareness of employees to utilize new and existing software with accuracy mentioning proper GL Code, Cost Centre, budget forecast and expenses.
- To resolve quarry raised by UKSC team instead of sent all required documents.
- Ensuring accuracy/ timely compliance in view of the high volume of transactions.
Key Result Areas
KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)
KRA1 Accounting
Implement established and approved accounting system to ensure financial discipline, to prevent irregularities and fulfill statutory requirements. -Assist superior in monitor and scrutinize the accounting activities of the Unit.
- Review of accounts related to Cash, Bank, Inter-Unit, Loans, expenses, Fixed assets, and parties and submit to PF & SH for further process.
- Identification and coordination for correction of accounting done by UKSC team.
- Ensure monthly/quarterly/annual closing related activities of general accounts.
- Interact with stakeholders (inside & outside Unit) and reply to their queries.
- Ensuring MSME vendor compliances.
KRA2 Accounting of UCWF (CSR expenses) other entities like ABPS, etc. -Ensure timely preparation of Budget of all entities.
- Bill passing and payment of UCWF related activities.
- Review of transactions of all the entities and suggest scope of improvement.
KRA3 Focus on SHE (Safety, Health & Environment) along with Sustainability initiatives -Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.
- Educating team about “I know my job”, “I know the hazards associated with my job and I applied control measures” & “I escalate to my senior” among manpower deployed in sections/department manpower including peer, WB & CL manpower
- Timely conducting scheduled SO round and reporting of -accidents, incidents and near misses on occurrences in the area of concern in system.
- Active participation in safety training, safety sub committees, standard champions meeting and any safety event.
- Ensure good housekeeping, limited use of power, no leakage of water, oil, air etc. and reporting concerned if any abnormalities for corrective action.
- Adhering of all safety precautions on the site and off the site
Replicating good practice for saving environment for long run sustainability and creating awareness among manpower to save guard natural resources.
KRA4 Ensuring IMS & WCM Compliances -100% Adhere ABOEF related activity like Kaizen, OPL, Suggestion, Good to find as per defined target.
- Assigning & Implementation of all approved suggestions
BCE & 5S score of concern GRT's.
- Developing of New Model area and sustaining current model area.
- Ensure to conduct quarter audit by cross function GRT team.
- Ensuring documentation and conformity to IMS & ISO standards.
- Encouraging teams to actively participate in IMS and WCM activities.
Click on Apply to know more.