Celeros Flow Technology
Website:
celerosft.com
Job details:
Celeros Flow Technology, LLC
1.0 Job Summary
Material Planning Engineer will be responsible for the strategic oversight and management of all materials-related activities for the Ghaziabad Manufacturing Facility. This role is responsible for collaborating with Project Management, Engineering, Production and Supply Chain teams to ensure timely procurement and effective utilisation of materials, managing the master production schedule, producing an achievable shop floor schedule and optimising inventory levels. The ideal candidate will possess a deep understanding of manufacturing processes, supply chain dynamics, and project management.
2.0 Principle Duties and Responsibilities
- Responsible to execute the site materials plan meeting customer requirements
- Develop and implement materials management strategies aligned with project requirements and organizational goals
- Analyse project demands and forecast material needs based on production schedules and lead times
- Oversee inventory control processes, ensuring accurate tracking and reporting of materials
- Implement best practices for inventory turnover and minimize excess stock while avoiding shortages
- Identify opportunities for process improvements and take initiatives to enhance materials management efficiency
- Develop training programs to enhance the team's skills in materials management and supply chain processes
- Where slippages occur, ensure steps are taken and communicated to the Site Lead and relevant functional leads with a recovery plan
- Responsible for reporting Materials related metrics to the organization.
3.0 Knowledge, Skills And Abilities
- Strong Interpersonal skills as part of working in a dynamic matrix organization
- Strong adaptable individual with the ability to multitask with high work loads
- Demonstrated critical thinking & logical skills with a proven track record in a complex factory environment.
- Demonstrated capability to manage change
- An analytical approach to planning and problem solving
- Capable of helping to forge and foster a culture of continuous improvement
- Able to effectively manage conflicting priorities
- Ability to evaluate situations, assess impact and risk whilst advising on and justifying proposed course(s) of actions
- A confident communicator both verbally and written
4.0 Education and Experience
- BE/BTech in mechanical engineering. Diploma in material management would be preferred.
- Minimum 7-8 years of experience as PPC/ material planner in pump or similar industry is essential.
- Proficiency in Microsoft Office, including Word, Excel and PowerPoint is essential.
- The ability to work as part of a multi-functional team.
- A strong awareness and approach to safe working practices.
- Any knowledge of pump hydraulics would be advantageous
- Ability to demonstrate solid written and oral communication skills. Ability to speak effectively before groups of customers or employees of organization.
5.0 KPIs
- Customer Need On Time Delivery
- Manufacturing Need On Time Delivery (Production Schedule adherence)
- Aged Shipments
- Work Centre Utilisation
- Work Order Aging
- Exception Messages (Push-Out, Pull-In, Cancellation etc)
- Excess Inventory
- Factory Capacity Accuracy vs Actuals
- Factory Hours Load vs Plan
Click on Apply to know more.